NEW ORLEANS -- BP engineers working to choke the flow of oil into the Gulf of Mexico found a leak on a line attached to the side of the new well cap and were trying to fix it Thursday before attempting to stop the flow of crude.
BP said Wednesday evening it had isolated the leak and was repairing it before moving forward. It wasn't clear how it would affect the timing of the operation, or whether oil continued to be slowly closed off into the cap.
Work started earlier Wednesday after a day-long hiatus to allay government fears that the disaster could be made worse by going forward with the tests to determine whether the temporary cap can withstand the pressure and contain the oil. It was the best hope yet of stopping the crude from streaming into the water for the first time since the April 20 explosion on the Deepwater Horizon rig that killed 11 people.
The process began with BP shutting off pipes that were funneling some of the oil to ships on the surface so the full force of the gusher went up into the cap. Then deep-sea robots began slowly closing, one at a time, three openings in the cap that let oil pass through. Ultimately, the flow of crude will be blocked entirely.
Read more
Showing posts with label gulf oil spill. Show all posts
Showing posts with label gulf oil spill. Show all posts
Thursday, July 15, 2010
Thursday, May 27, 2010
On Doomed Rig, There Was 'Nobody in Charge'
Published May 28, 2010 | The Wall Street Journal
AP
Apr. 21: An oil slick is seen as the Deepwater Horizon oil rig burns in the Gulf of Mexico.
Andrea Fleytas, a 23-year-old worker who helped operate the rig's sophisticated navigation machinery, suddenly noticed a glaring oversight: No one had issued a distress signal to the outside world, she recalls in an interview. Ms. Fleytas grabbed the radio and began calling over a signal monitored by the Coast Guard and other vessels.
Read More
Labels:
barack obama,
bp,
florida,
gulf oil spill,
halliburton,
louisiana,
oil crisis,
transocean
Friday, May 21, 2010
BP delays attempt to plug leak with mud
White House taps Graham, Reilly to lead investigative panel
John Moore / Getty Images
Phil Radford, executive director of Greenpeace USA, inspects oil-covered reeds while visiting Venice, La., on Thursday.
By GREG BLUESTEIN
updated 32 minutes ago
ROBERT, La. - It will be at least Tuesday before engineers can shoot mud into a blown-out well at the bottom of the Gulf of Mexico, BP said Friday in yet another delay in the monthlong effort to stop the oil that is now washing into wetlands and onto at least one public beach.
A so-called "top kill" has been tried on land but never 5,000 feet underwater, so scientists and engineers have spent the past week preparing and taking measurements to make sure it will stop the oil that has been spewing into the sea for a month. They originally hoped to try it as early as this weekend.
BP spokesman Tom Mueller said there was no snag in the preparations, but that the company must get equipment in place and finish tests before the procedure can begin. BP already has three deepwater rigs and other equipment near the blown-out well.
Labels:
bp,
gulf oil spill,
halliburton,
oil crisis,
oil spill,
transocean
Subscribe to:
Posts (Atom)